add SVP64 intro page
[libreriscv.git] / 180nm_Oct2020.mdwn
index d0976458c9c83726f6626babbc42f7e37156fe36..9f948f55165456a72961f76c4e704de006d7393a 100644 (file)
@@ -1,5 +1,7 @@
 # 180 nm ASIC plan for Oct 2020
 
 # 180 nm ASIC plan for Oct 2020
 
+NOTE: moved to Jun 9th 2021 (sigh should not have put a date in the page name, oh well)
+
 This page is for discussion of what we can aim for and reasonably achieve.
 To be expanded with links to bugreports
 
 This page is for discussion of what we can aim for and reasonably achieve.
 To be expanded with links to bugreports
 
@@ -28,6 +30,7 @@ Links:
 * [[180nm_Oct2020/interfaces]] we need as a bare minimum include JTAG,
   GPIO, EINT, SPI and QSPI, I2C, UART16550, LPC (from Raptor Engineering)
   and that actually might even be it.
 * [[180nm_Oct2020/interfaces]] we need as a bare minimum include JTAG,
   GPIO, EINT, SPI and QSPI, I2C, UART16550, LPC (from Raptor Engineering)
   and that actually might even be it.
+* [[180nm_Oct2020/ls180]] actual auto-generated pinouts by pinmux program
 
 ## Secondary priorities
 
 
 ## Secondary priorities
 
@@ -55,12 +58,28 @@ Links:
 * Rudi from <http://asics.ws> to cover the interface set
 * [[lkcl]] for the scoreboard systems
 * [[programmerjake]] TODO
 * Rudi from <http://asics.ws> to cover the interface set
 * [[lkcl]] for the scoreboard systems
 * [[programmerjake]] TODO
-* [[Yehowshua_Immanuel]] - Delegate interfaces and do timeline/cost projections
-* [[mnolan]] pipelines 
-* [[tplaten]] TODO
+* [[tplaten]] memory and cache
 * [[jock_tanner]] TODO
 * MarketNext TODO
 
 * [[jock_tanner]] TODO
 * MarketNext TODO
 
-# Preliminary coriolis2 ASIC layout, 02jul2020
+# Preliminary coriolis2 ASIC layout
+
+## 02jul2020 - first version
+
+* <http://lists.libre-riscv.org/pipermail/libre-riscv-dev/2020-July/008438.html>
 
 [[!img 180nm_Oct2020/2020-07-02_19-01.png size="900x" ]]
 
 [[!img 180nm_Oct2020/2020-07-02_19-01.png size="900x" ]]
+
+## 03jul2020 - DIV unit added
+
+[[!img 180nm_Oct2020/2020-07-03_11-04.png size="900x" ]]
+
+## 28dec2020 - End of year progress update
+
+### With blockage layers
+
+[[!img 180nm_Oct2020/2020-12-28.png size="900x" ]]
+
+### Without blockage layers so wires can be seen more clearly
+
+[[!img 180nm_Oct2020/2020-12-28_without_blockages.png size="900x" ]]