struct haifa_sched_info: prev_head and next_tail
authorDavid Malcolm <dmalcolm@redhat.com>
Mon, 25 Aug 2014 20:49:19 +0000 (20:49 +0000)
committerDavid Malcolm <dmalcolm@gcc.gnu.org>
Mon, 25 Aug 2014 20:49:19 +0000 (20:49 +0000)
gcc/
* sched-int.h (struct haifa_sched_info): Strengthen fields
"prev_head" and "next_tail" from rtx to rtx_insn *.

From-SVN: r214477

gcc/ChangeLog
gcc/sched-int.h

index c087a653f111a78037cf1a0b2fde7ea5ca8edca3..ae868f0496b5ae8b514ecf9016f34747050ef5ba 100644 (file)
@@ -1,3 +1,8 @@
+2014-08-25  David Malcolm  <dmalcolm@redhat.com>
+
+       * sched-int.h (struct haifa_sched_info): Strengthen fields
+       "prev_head" and "next_tail" from rtx to rtx_insn *.
+
 2014-08-25  David Malcolm  <dmalcolm@redhat.com>
 
        * rtl.h (rtx_jump_table_data::get_labels): New method.
index ae048c1f6460d24a4fd4c71b37d8109d72fe66da..220e26d348a5dd3641cf098b35646ca07f08a40c 100644 (file)
@@ -607,7 +607,7 @@ struct haifa_sched_info
   bool (*insn_finishes_block_p) (rtx);
 
   /* The boundaries of the set of insns to be scheduled.  */
-  rtx prev_head, next_tail;
+  rtx_insn *prev_head, *next_tail;
 
   /* Filled in after the schedule is finished; the first and last scheduled
      insns.  */