From: Yann E. MORIN Date: Sun, 7 Feb 2016 21:34:26 +0000 (+0100) Subject: core: catch failures in graph-depends X-Git-Url: https://git.libre-soc.org/?a=commitdiff_plain;h=5e7020ef643c3266d31027bcdb50d59767adc87e;p=buildroot.git core: catch failures in graph-depends Currently, we generate the dependency graph in a single command, piping the stdout of support/scripts/.graph-depends to the stdin of dot. Unfortunately, this means we can't catch a failure of graph-depends, as the shell can only treturn the exit code of the last command in a pipe. Still, we do want to keep the output of graph-depends, and we in fact do keep it by mean of a tee. graph-depends has just gained the ability to generate its output to a file, so we break the pipe in two differnet commands, so we can bail out on graph-depends errors. Do that for the two call sites. Signed-off-by: "Yann E. MORIN" Cc: Thomas Petazzoni Signed-off-by: Thomas Petazzoni --- diff --git a/Makefile b/Makefile index 68259fd6a1..7c5daa43b2 100644 --- a/Makefile +++ b/Makefile @@ -721,8 +721,10 @@ graph-depends: graph-depends-requirements @$(INSTALL) -d $(GRAPHS_DIR) @cd "$(CONFIG_DIR)"; \ $(TOPDIR)/support/scripts/graph-depends $(BR2_GRAPH_DEPS_OPTS) \ - |tee $(GRAPHS_DIR)/$(@).dot \ - |dot $(BR2_GRAPH_DOT_OPTS) -T$(BR_GRAPH_OUT) -o $(GRAPHS_DIR)/$(@).$(BR_GRAPH_OUT) + -o $(GRAPHS_DIR)/$(@).dot + dot $(BR2_GRAPH_DOT_OPTS) -T$(BR_GRAPH_OUT) \ + -o $(GRAPHS_DIR)/$(@).$(BR_GRAPH_OUT) \ + $(GRAPHS_DIR)/$(@).dot graph-size: $(Q)mkdir -p $(GRAPHS_DIR) diff --git a/package/pkg-generic.mk b/package/pkg-generic.mk index 1e024d3484..e22babbcd0 100644 --- a/package/pkg-generic.mk +++ b/package/pkg-generic.mk @@ -668,9 +668,11 @@ $(1)-show-depends: $(1)-graph-depends: graph-depends-requirements @$$(INSTALL) -d $$(GRAPHS_DIR) @cd "$$(CONFIG_DIR)"; \ - $$(TOPDIR)/support/scripts/graph-depends -p $(1) $$(BR2_GRAPH_DEPS_OPTS) \ - |tee $$(GRAPHS_DIR)/$$(@).dot \ - |dot $$(BR2_GRAPH_DOT_OPTS) -T$$(BR_GRAPH_OUT) -o $$(GRAPHS_DIR)/$$(@).$$(BR_GRAPH_OUT) + $$(TOPDIR)/support/scripts/graph-depends $$(BR2_GRAPH_DEPS_OPTS) \ + -p $(1) -o $$(GRAPHS_DIR)/$$(@).dot + dot $$(BR2_GRAPH_DOT_OPTS) -T$$(BR_GRAPH_OUT) \ + -o $$(GRAPHS_DIR)/$$(@).$$(BR_GRAPH_OUT) \ + $$(GRAPHS_DIR)/$$(@).dot $(1)-all-source: $(1)-source $(1)-all-source: $$(foreach p,$$($(2)_FINAL_ALL_DEPENDENCIES),$$(p)-all-source)